Development Simplified by Module

Module Process

Streamlining Housing Development

Experience the Module Process—an innovative approach to delivering high-quality, sustainable housing. With thoughtful designs, factory-built precision, and efficient on-site assembly, we simplify the development process, saving you time and money. Partner with us to create modern, energy-efficient homes that stand out.

Illustration of a row of houses with a location pin, checklist, and price chart showing $3M-$3.2M.

Phase 1

Pre-Development

We jointly determine if Module is the right fit for your site, budget, and goals.

  • We'll talk through your project and get you all the information you need about Module.

  • A report that helps potential customers understand if their project is practical based on site conditions, zoning, and cost. Module has a free and a paid Feasibility Study.

    See a sample >

  • Are we mission-aligned? Does the high-level estimate fit within your expectations? Is the site feasible for the delivery of modular housing?


Illustration of house layout with 'Approved' stamp over floor plans and a $3.1M price tag.

Phase 2

Pre-Construction

Members of the Module Design team will produce final drawings, secure building permits, and lock-in pricing for the factory-built components.

  • Module's design team works with you to select a standard design or modify a design for manufacture.

  • We work together to secure zoning approval and create drawings for permits.

  • Module assists you in creating a project management plan, including a detailed breakdown of project scope and responsibilities.

  • Module helps refine selections for your budget.

    Module provides pricing after selections and factory drawings are approved.


Illustration of a crane lifting a modular building next to two factory-like structures.

Phase 3

Construction

While your home is being precision-built in our manufacturing facility, Module Build will be conducting site work—including foundation prep and utility connections, simultaneously. This parallel process significantly reduces build time.

  • Module Manufacturing frequently inspects the boxes during construction and relays updates to you.

  • Module coordinates the delivery of the modular boxes with the set crew and crane for installation.

  • The boxes are delivered about 80% complete. You or Module will coordinate the finishing.


Illustration of houses with icons representing utilities and services

Phase 4

Post-Construction

Module helps to secure certifications such as Energy Star and ZERH, and coordinates warranty-related items.

  • Module shares a complete warranty with you.

  • Your feedback is extremely important. Module follows up at 60 and 360 days.

Our Construction Timeline

Module homes are built in a factory using modular construction. Building in a controlled environment means our homes are more precisely constructed and are 25-40% quicker to build than a traditional home. The parallel process of onsite prep reduces the overall timeline.

Get to know us through the Housing Venture Lab Series by Terner Labs.

Case study cover for Black Street Development with an image of modern houses at dusk. Includes contact information for Module Housing.

Case Study

Black Street Development

See the process in action!